Publications and Consultation
Project Reports
- Final Option Appraisal Report - Non Technical Summary (November 2016)
- Final Option Appraisal Report - Full Report (November 2016)
- Executive Summary
- Introduction
- Remaining Viable Options
- Preliminary Options Appraisal Report (POAR) - Public Consultation
- Interim Demand Review and Phasing of Supply
- Source Abstraction Regime
- Appraisal of Source Impact
- Economic Appraisal
- Preferred Scheme
- Community Benefit Opportunities
- Preferred Scheme - Infrastructure Sites
- Preferred Scheme - Transmission Pipeline
- Concluding Statement
- Next Step
- Schedule of Drawings
- Appendix A Interim Midlands and GDA Water Resource Plan
- Appendix B Hydrodynamic and Water Quality Modelling Report
- Appendix C Cost-Benefit Analysis of Water Supply Projects for the Eastern and Midlands Region
- Appendix D Review of Treatment Technology
- Appendix E Raw Water Abstraction
- Appendix F Water Treatment Plant
- Appendix G Break Pressure Tank
- Appendix H Termination Point Reservoir
- Appendix I Transmission Pipeline
- Appendix J Preliminary Options Appraisal - Consultation Submissions Report
- Water Supply Project E Kennedy Response Summary
- Response to the December 2016 Submission from Emma Kennedy
- Preliminary Options Appraisal Report - Non Technical Summary (November 2015)
- Vol 1 Preliminary Options Appraisal Report - Full Report (updated August 2016 to correct mapping error)
- Vol 2 Appendix A, B, C, D
- Vol 3 Appendix E
- Vol 4 Appendix F
- Vol 5 Appendix G
- Vol 6 Appendix H
- Least Constrained Corridor Mapping - Discovery series
- Water Supply Options Working Paper Non-Technical Summary (June 2015)
- Water Supply Options Working Paper (June 2015)
- Appendix A - Response to Feedback from the Project Need Report Consultation
- Appendix B - Source Yield Assessment
- Appendix C - Habitats Directive Assessment
- Appendix D - Multi Criteria Analysis Assessment
- Appendix E - Strategic Environmental Assessment (2007-2011)
- Appendix F - Strategic Environmental Assessment (2007-2011) Consultation Review
- Appendix G - Strategic Environmental Assessment (2007-2011)
- Project Need Report (February 2015)
- Appendix A - Summary of Demographic Projections
- Appendix B - (WSP) Economic Needs Report
- Appendix C - Water Demand Review